Upgrade power control scheme
Once container and downstream manager are implemented, connect the power control to it.
The TODO for this issue are:
- Add downsteam-awareness to actuator FSM
- Add topology awareness to power management
- Add multi-container control loop
- Merge GRM API into upstream API
Depends on #1 (closed), #2 (closed), and #5.